HomeSporting GoodsSports & FitnessHunting & FishingFishingTerminal TackleHooksLawaia 25M Length Fishing Net Three-layer White Silk Gillnet Plastic Float Long Lead Sticky Hanging Net Retractable Fishing Trap
product_image_name-Generic-Lawaia 25M Length Fishing Net Three-layer White Silk Gillnet Plastic Float Long Lead Sticky Hanging Net Retractable Fishing Trap-1

Share this product

Lawaia 25M Length Fishing Net Three-layer White Silk Gillnet Plastic Float Long Lead Sticky Hanging Net Retractable Fishing Trap

KSh 4,926
KSh 6,64826%

In stock

+ shipping from KSh 515 to CBD - UON/Globe/Koja/River Road
0 out of 5
(No ratings available)
Variation available

Promotions

Delivery & Returns

Choose your location

Pickup Station

Delivery Fees KSh 515
Ready for pickup between 03 July and 05 July if you place your order within the next 14hrs 44mins

Door Delivery

Delivery Fees KSh 635
Ready for delivery between 03 July and 05 July if you place your order within the next 14hrs 44mins

Return Policy

Easy Return, Quick Refund.Details

Seller Information

Desert Vault

84%Seller Score

3 Followers

Follow

Seller Performance

Shipping speed: Average

Quality Score: Excellent

Customer Rating: Good

Product details

  • Welcome to our srore.
  • Type:Wrist Strap
  • Durable Material
  • Stylish Design
  • Versatile Usage
  • Great Value
  • With Glueing or Not: No
  • Mesh Size: Large Mesh
  • Depth: 1.2
  • Knot Type: Double
  • Style: Monofilament
  • Plastic Type: ABS
  • Type: Gillnet
  • Positionable or Not: Yes
  • Retractable or Not: Yes
  • Product Type: Fishing Nets
imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage

Specifications

Key Features

  • Welcome to our srore.
  • Type:Wrist Strap
  • Durable Material
  • Stylish Design
  • Versatile Usage
  • Great Value
  • With Glueing or Not: No
  • Mesh Size: Large Mesh
  • Depth: 1.2
  • Knot Type: Double
  • Style: Monofilament
  • Plastic Type: ABS
  • Type: Gillnet
  • Positionable or Not: Yes
  • Retractable or Not: Yes
  • Product Type: Fishing Nets

Specifications

  • SKU: GE840SE47YEPDNAFAMZ
  • Production Country: China
  • Weight (kg): 0.5
  • Warranty Type: Repair by Vendor

Customer Feedback

This product has no ratings yet.

Lawaia 25M Length Fishing Net Three-layer White Silk Gillnet Plastic Float Long Lead Sticky Hanging Net Retractable Fishing Trap

Lawaia 25M Length Fishing Net Three-layer White Silk Gillnet Plastic Float Long Lead Sticky Hanging Net Retractable Fishing Trap

KSh 4,926
KSh 6,64826%
Questions about this product?

Recently Viewed

See All