Description of spring pressure
(take the yellow spring as an example):
When the pressure reaches 0.6 Bar (ie 8.7 PSI),
The spring begins to work, and the
volute exhaust valve begins
to open; when the pressure reaches
1.0 Bar (ie 14.5 PSI),
The volute exhaust valve is fully open.
Inspection before installation
1. The inspection must be carried out after the engine is stopped and cooled, and must not be started during the inspection
engine to avoid personal injury.
2. Please check whether the air filter is clean and in good condition.
3. Please check whether the clamp of the intake pipe at the compressor end of the turbocharger is loose and the exhaust at the volute end
Check the manifold for foreign objects.
4. Please check whether the oil inlet pipe and oil return pipe are clean, and the oil pipe cannot be twisted and blocked.
5. Please check whether the oil in the oil pan needs to be replaced.
OK, so as to avoid oil stains on the oil pan, and the oil filter should be replaced when changing the oil.
window.adminAccountId=243669743;


?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443

?width=186&height=257&hash=443
