close filters Filter
Express Delivery
  • info-icon
View More
Brand arrow
close filters Brand
Brand
View More
Price (KSh)
  • -
Product Rating
View More
SELLER SCORE
View More
SELLER
View More
COLOR
View More
MATERIAL
View More
View more filters
Reset Show (27)

Mm red led with long leads

(27 products found)
Related results:
|
|
Sort by: Popularity arrow
    Sort by close
Related results:
|
|
Discover our high-quality 5mm red LED with long leads, perfect for various DIY projects and electronic applications. Designed for optimal brightness and efficiency, this LED offers exceptional performance and durability. Its extended leads make installation seamless, allowing for versatile use in circuit boards, lighting displays, and more. Ideal for hobbyists and professionals alike, our red LED is a reliable choice for enhancing your projects. Illuminate your creations with precision and style!
Read more
Brand arrow
Brand close
Clear All Save
Price arrow
Price (KSh) close
  • -
Reset
10M Red 100 LED Fairy String Light

10M Red 100 LED Fairy String Light

This Red fairy string lig
KSh 999.00
(1)
Add to cart
10M Red 100 LED Fairy String Light

10M Red 100 LED Fairy String Light

100 LED lights cover a la
KSh 699.00
KSh 999.00 -30%
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
Diffused Red 5mm LED (25 Pack)

Diffused Red 5mm LED (25 Pack)

Need some indicators? We
KSh 899.00
KSh 1,000.00 -10%
Add to cart
1.0mm Single Core Electrical Cable 90 Meters Red

1.0mm Single Core Electrical Cable 90 Meters Red

The 1.0mm Single Core Ele
KSh 1,120.00
Add to cart
Test Leads (Multimeter Leads)

Test Leads (Multimeter Leads)

Bend plug black red. Secon
KSh 940.00
Add to cart
MULTI COLOURED Led Lights 10mtrs Long

MULTI COLOURED Led Lights 10mtrs Long

10mtrs long Led Lights.mu
KSh 999.00
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
Best Performance 1.5MM 90M Metres Long Single Core Electrical Wiring Cable-Red For Lighting Wiring

Best Performance 1.5MM 90M Metres Long Single Core Electrical Wiring Cable-Red For Lighting Wiring

Roll of 1.5mm wiring sing
KSh 1,600.00
KSh 1,620.00 -1%
Add to cart
Christmas Multicolour 10mtrs Lights

Christmas Multicolour 10mtrs Lights

10mtrs long Led Lights.mu
KSh 1,200.00
(42)
Add to cart
1.0mm Single Core Electrical Cable 90 Meters Red

1.0mm Single Core Electrical Cable 90 Meters Red

The 1.0mm Single Core Ele
KSh 1,120.00
Add to cart
LED String Lights - Roses, Ambient Lighting,3m Battery Operated Flower String Lights with 20 LEDs, Hanging Flower Garland for Wedding, Bedroom, Christmas Decoration、Part - Artificial flowers-Red

LED String Lights - Roses, Ambient Lighting,3m Battery Operated Flower String Lights with 20 LEDs, Hanging Flower Garland for Wedding, Bedroom, Christmas Decoration、Part - Artificial flowers-Red

LED String Lights. Roses
KSh 790.00
KSh 1,215.00 -35%
express
Add to cart
1.0mm Electrical Installation Wire Red

1.0mm Electrical Installation Wire Red

The 1.0mm Single Core Ele
KSh 1,470.00
Add to cart
Tester Tips for Test Leads Multimeter Cable Tester Replacement Compatible with Digital Multimeter Protection 1000V

Tester Tips for Test Leads Multimeter Cable Tester Replacement Compatible with Digital Multimeter Protection 1000V

This set of test tips are
KSh 599.00
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
200PC 3MM 5MM short feet Led With Box Mixed Color Light Emitting Diode Kit

200PC 3MM 5MM short feet Led With Box Mixed Color Light Emitting Diode Kit

200PC/Lot 3MM 5MM short f
KSh 750.00
(2)
Add to cart
1.0mm PVC Insulated Electrical Cable Red

1.0mm PVC Insulated Electrical Cable Red

The 1.0mm Single Core Ele
KSh 1,220.00
Add to cart
10meters 100 Lights Waterproof LED Christmas String RED - Decoration Colorful Lights Lighting Wedding Party Home Yard Decor - All Colours

10meters 100 Lights Waterproof LED Christmas String RED - Decoration Colorful Lights Lighting Wedding Party Home Yard Decor - All Colours

Artistic appearance, it i
KSh 1,250.00
Add to cart
EVINCAB CAPACITY: 450/750V QUANTITY :90 METERS DESCRPTION 1.5MM SINGLE CORE

EVINCAB CAPACITY: 450/750V QUANTITY :90 METERS DESCRPTION 1.5MM SINGLE CORE

EVINCAB CAPACITY: 450/750
KSh 1,450.00
KSh 2,500.00 -42%
Add to cart
EVINCAB CAPACITY: 450/750V QUANTITY :90 METERS DESCRPTION 1.5MM SINGLE CORE

EVINCAB CAPACITY: 450/750V QUANTITY :90 METERS DESCRPTION 1.5MM SINGLE CORE

EVINCAB CAPACITY: 450/750
KSh 1,500.00
KSh 2,500.00 -40%
Add to cart
LED 5mm RED WATER CLEAR ULTRA BRIGHT 10pcs

LED 5mm RED WATER CLEAR ULTRA BRIGHT 10pcs

Emitting color: Red. Specif
KSh 800.00
KSh 1,000.00 -20%
Add to cart
1.0mm Single Core Electrical Cable 90 Meters Red

1.0mm Single Core Electrical Cable 90 Meters Red

The 1.0mm Single Core Ele
KSh 1,799.00
KSh 4,500.00 -60%
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
1.0mm Single Core Electrical Cable 90 Meters Red

1.0mm Single Core Electrical Cable 90 Meters Red

The 1.0mm Single Core Ele
KSh 1,120.00
Add to cart
1.0mm Electrical Cable Red 90 Meters

1.0mm Electrical Cable Red 90 Meters

The 1.0mm Single Core Ele
KSh 2,070.00
Add to cart
1.0mm Single Core Electrical Cable 90 Meters Red

1.0mm Single Core Electrical Cable 90 Meters Red

The 1.0mm Single Core Ele
KSh 1,120.00
Add to cart
Sort by icon sorting Filter filters icon
scroll to top back to top